In the map of ITS-X Engineering Room are only 4 consoles drawn but in the description is written a fifth console in the Objective Room. What is correct?
It has been mentioned in previous threads (by Hellois) that you should trust the description, not the map. In this case, I assume the map reflects that you can place tehe consoles following 2 options (or that is the map they used for Cold Sleep XD)